Safe Routes To School Project

WHO WE ARE

New Plymouth, Idaho

This project included improvements to the sidewalk condition on S. Plymouth Avenue, from a distance of approximately 1300 feet.  Sidewalk improvements include removal and replacement of existing full width sidewalks with 10 ft. wide sidewalks, ADA compliant pedestrian ramps, installation of a decorative street lighting system supplemented with roadway lighting as per AASHTO standards with underground electrical conduits for power supply.

The project length is approximately 0.25 miles in length and improved the west side of S. Plymouth Ave.  The HECO Team assisted the city with obtaining funding, and design of the project.

Services Provided by HECO Engineers:

  • Project Management
  • Construction Management
  • Survey
  • Civil Engineering
  • Preliminary Engineering
  • Construction Documents