Bret Turner

Over 20 Years of Construction Engineering & Cost Estimating Experience 

Born in Baker, Oregon, Bret has stayed fairly close to home and now has a small farm in the Treasure Valley. He has been a part of the HECO team since 2014 and is an integral part of our Cost Estimating department.

               OUT OF THE OFFICE

Hunting, fishing, riding the range on his family’s 4-wheeler, playing with our dogs. Managing his farm with his wonderful wife of thirty years and spending time with his two grown daughters.

               WORK HISTORY & EXPERTISE

Bret began his career as a construction manager in the Northwest region of the country in 1989. He has been a project estimator and manager for numerous projects in Idaho and Oregon, the primary scope of his work being water, wastewater, storm water, transportation, and other municipal projects. He is currently working on projects for the National Parks Service for municipal improvement projects including water and wastewater infrastructure improvements. As a project estimator and project manager, he has been responsible for project planning, preliminary and final design, construction administration, and project close-out. His responsibilities also include water and wastewater system compliance with state and federal regulations.

 

 

“I am a firm believer that hard work pays off, and following the Golden Rule by treating people as you want to be treated is a good way to live life.”

Education & Training

  • BS, Construction Engineering Management, Oregon State University, 1989

He is humble and kind to everyone. He takes his job seriously and takes pride in doing his job well. He looks out for the wellbeing of the company and he genuinely cares for others wellbeing, personally and professionally. He is quick to offer help with any task and will always defend what is right. He is dependable and reliable. He would likely be a knight if we were in the middle ages; Sir Bret.

- Coworker

More EXPERTS 

Great teamwork can make things go from subpar to spectacular. Each member of the HECO team is talented, experienced, and dedicated to the providing the highest quality of work.

John Blom

John Blom

President

Robert Almanza

Robert Almanza

Staff Engineer

George Murgel, PE, PhD

George Murgel, PE, PhD

Project Engineer

Shawna Warden

Shawna Warden

Administrative Assistant

Our PROJECTS

From small jobs to complex and challenging ones, we approach every project with a commitment to excellence.

Stehekin Wastewater Treatment Plant Replacement

Stehekin, Washington is located along the northeast shore of Lake Chelan in the Lake Chelan National Recreation Area near the south end of North Cascades National Park.  The National Park Service owns and operates a physical-chemical wastewater treatment plant (WWTP), which was designed and constructed in 1974-76 to treat 25,000 gallons per day (gpd) of domestic wastewater from the community near Stehekin Landing.  HECO completed a Condition Assessment Report on the facility, identifying WWTP building and wastewater treatment system deficiencies in order to determine the scope and need for a new wastewater treatment system.

Replacement of Non-Compliant Water Treatment System

Tuolumne Meadows is a popular destination located on Highway 120 in Yosemite National Park.  It is a high use area and is one of the Park’s most prominent attractions.  A surface water treatment system provided treated drinking water for employees and recreational visitors in the Tuolumne Meadows area.  The water treatment system was constructed in 1967 with filtration upgrades in 1984.  It was an aged facility with outdated technology.  HECO evaluated alternatives, which included treatment technologies best suited for remote sites with limited operating staff.

Providing Safe Routes to School

The project included improvements to the sidewalk condition on S. Plymouth Avenue, from a distance of approximately 1300 feet.  Sidewalk improvements include removal and replacement of existing full width sidewalks with 10 ft wide sidewalks, ADA compliant pedestrian ramps, installation of a decorative street lighting system supplemented with roadway lighting as per AASHTO standards with underground electrical conduits for power supply.  The project length is approximately 0.25 miles in length and improved the west side of S. Plymouth Ave.  The HECO Team assisted the city with obtaining funding, and design of the project.

Eagle Road Underpass Pathway

This project involved linking three existing pathways on the east and west side of Eagle Road by construction of a pedestrian underpass under Eagle Road.  Project highlights include installation of pavement, landscaping, benches, lighting, and railing along the underpass portion of the pathway.  The project passes through the existing bank and riprap along the north bridge abutment and the pathway was excavated into existing fill material on the north bank of the river while a concrete cut off stem was constructed.  Riprap armament was relocated on the lower sections of the riverbank.

Wastewater Treatment Facility Improvements

This project included the construction of improvements to the municipal wastewater facility to meet a DEQ issued consent order and to provide adequate capacity for existing connections.  The City’s existing facility was a non-discharging facility and had reached capacity requiring frequent pumping and transport of wastewater to other facilities.  This project designed 19 million gallons, total volume, of new HDPE lined reservoirs to allow for a fully evaporative system and not require any discharge.  The facility was designed utilizing property that was located approximately 110 feet below the existing facility, which eliminated the need for pumping facilities and thereby a very sustainable system with very low operating costs.